Online
Offer
Customized
Hotline
Hotline

400-032-0266

Top
Location:Home>Problem>Low nitrogen boiler common pro>How to make low nitrogen boiler installation method right

How to make low nitrogen boiler installation method right

Time: 2019-08-17

In low nitrogen boiler installation, the first to examine the installation environment, low nitrogen boiler room layout should obtain the consent of the local quality and technical monitoring part before construction, should be independent of the boiler room should be installed in the drafty, heat dissipation, easy to flue gas emissions and manipulation of the place.
Can't close to inflammable and explosive articles, electrical installation should be professional and technical staff, please according to the national related scale installation, and the N and L can't wrong. When using gas as fuel electric explosion-proof device should be installed, and the panel should be more than 6 m from the boiler.
Second, condensing boiler low nitrogen ground is related to the use of safe, therefore should be reliable grounding line installation, ground wire should be nearby pile, depth is greater than or equal to 1 m 5, ground wire cable connection on the head of pile head should be sintered in the ground. In order to prevent rust be affected with damp be affected with damp connection joint should be higher than the ground it is advisable to 100 mm. To discharge waste gas boiler chimney should be out to outdoor, should be higher than that of the boiler and the exit of 1.5 to 2 meters distance.

After boiler installed low nitrogen shall declare at the local special equipment maintenance division. Use with the approval of the relevant part of the acceptance, and the low nitrogen use card of the boiler rear can use. Volume is less than 30 l or steam pressure is less than 0.1 MPa steam generator shall be owned by the state inspection exemption scope, namely do not need to deal with the boiler use card can be used.

News
More
2019-08-16
Leadership speech
Industry Information
More